Orne Studio. Vessel Nº 7, from $480.

One vessel, made to order in glass, stone or brushed steel.

  1. Glass

    Light goes straight through it, and leaves a little of itself behind.

    Mouth-blown optical glass, 1.4 kg

  2. Stone

    Weight you can feel from across the room.

    Honed travertine, 4.2 kg

  3. Steel

    Cold, exact, and made to outlast the table it stands on.

    Brushed stainless steel, 3.1 kg

Finish
Reserve Nº 7

Three materials, one form

Nº 7 is turned from the same drawing in each material, so the twist, the lip and the foot are identical. What changes is the weight in your hands and how the light lands on it.

  • Vessel Nº 7 in clear glass

    Glass

    Mouth-blown optical glass, annealed over two days and polished until the twist disappears into the light. Holds water without a liner.

    Blown in Marinha Grande. 1.4 kg. Lead time 6 weeks.

    $480Edition of 120

  • Vessel Nº 7 in honed travertine

    Stone

    Cut from a single block of Roman travertine and honed, so no two share a vein. Sealed inside; it takes cut flowers but not a week of standing water.

    Cut in Vila Viçosa. 4.2 kg. Lead time 8 weeks.

    $720Edition of 60

  • Vessel Nº 7 in brushed stainless steel

    Steel

    Spun from 316 stainless, welded at the twist and brushed in one direction from lip to foot. It will mark; the marks are part of it.

    Spun in Águeda. 3.1 kg. Lead time 6 weeks.

    $590Edition of 90

Dimensions and care

The same in every material, give or take a millimetre of hand finishing.

Height
32 cm
Width at the belly
14 cm
Mouth
6.5 cm inside
Foot
9 cm, felt pad on stone and steel
Capacity
1.9 litres to the lip
Watertight
Glass and steel, yes; stone is sealed but drain it weekly
Cleaning
Warm water and a bottle brush. No dishwasher.
Packaging
Moulded pulp, no foam. Ships by courier, signed for.

Reserve Nº 7

Each piece is started when it's reserved. We take a 20% deposit now and the balance when it's ready to ship, with a photograph of your piece before it leaves.

From $480

  • Glass $480, steel $590, stone $720
  • 6 to 8 weeks, then 3 to 5 days in transit
  • Numbered and signed under the foot